The City is rehabilitating a portion of the sewer system serving the neighborhood in order to improve the existing sewer system and provide capacity for future flows. The project consists of the construction of approximately 4,950 linear feet of sewer construction on new alignment, including a below grade river crossing of the River and an aerial crossing of a tributary