The project consists of rehabilitating approximately 546 linear feet of 12-inch diameter sewer located under I95
with a cured-in-place-pipe liner and rehabilitating three manholes totaling approximately 37 vertical feet in
depth with a cementitious liner; providing one new 48 doghouse manhole approximately 19 vertical feet in
depth, including an outside drop connection; providing one new 48 monitoring manhole approximately 9
vertical feet in depth; providing approximately 47 linear feet of new 6-inch and 8-inch sewer; providing one new
cleanout; and the provision of all associated pump-around, erosion control, and appurtenances.
A non-mandatory pre-bid conference will be held at 10:00 a.m., April 21, 2010.