Removal of existing lift station equipment, preparation and modification of existing wet well; installation of submersible pumps, pump rails, wet well piping, float and level control system; installation of valve vault and equipment; abandonment of existing dry pit; installation of site piping, including fittings, valves, flow meter and utility boxes; installation of force main piping; installation of site electrical system, controls, cabinets, antenna, mast and conduits;