The Work covered under this Contract shall consist of the fabrication and erection of a triplex sewer lift station including the foundation, roofing, insulation, piping, painting, pumps, motors, electrical, instrumentation, communication, and miscellaneous accessories; the dismantling and removal of the existing sewer lift station facility and its appurtenances; modifications to and installation of new yard piping; restoration of site grading/work, precast concrete bridge culvert, tree removal and trimming; and the installation of asphalt and concrete paving.