The project will include but not limited to the following major categories of work:
6" Concrete Pavement 1304 SY
Storm Sewer Pipe 842 LF
Excavation 35,249.70 CY
8” Sanitary Sewer Pipe 2280 LF
12” D.I.P. Water Line 2,610.17 LF