1. Furnish and install replacement of all existing light bulbs (31-four bulb fixtures and 12-two bulb fixtures) with T8 fluorescent light bulbs and ballasts, as necessary to meet current lighting requirements.
1. Furnish and Install one (1) submersible centrifugal pump capable of pumping 650 gallons per minute (gpm) at 175 feet of total dynamic head (TDH), guide rails, VFD, controls and appurtenances.
2. Furnish and Install 6-inch, 8-inch and 12-inch ductile iron pipe, valves, fittings, pressure gauge, combination air valve, and appurtenances.
3. Provide new electrical installation including utilizing new and existing buried conduit, power and control wire, panels, power supply and other as required for a complete and operational installation.
4. Furnish necessary safety equipment, training and certification for man-entry into the existing wet well.