This Federal funded project will consist of reconstructing the existing road section, pedestrian facilities, and storm drainage features in the downtown area. The majority of the work will replace existing pavement with Portland cement concrete. Work on side roads will have the option of either Portland cement concrete pavement or asphalt pavement. Sewer main repair work is limited to a single location and is a minor amount of work relative to the road and storm drainage work.