The Authority requires the service of a qualified contractor to provide labor, chemicals, protective equipment and supplies for the removal of heavy soil and oxides from the exterior aluminum and painted carbody surfaces of 1106 Railcars. Period of performance includes a one-year base term and two one-year option terms.