Note: must register at site to access full RFP (registration is free).
The University is seeking statements of qualifications from engineering firms interested in providing design services for connecting Dining Commons with the Southeast Chilled Water Plant for supplying chilled water to the facility. Included in the design will be the removal of the existing, to be abandoned, chilled water equipment in Dining Commons. Estimated cost of project (design & construction) - $350,000.