In general, this project consists of replacement of approximately 500 LF of direct-buried steam and condensate piping between two existing steam manholes 68 and 70. An additional steam manhole will be added to serve the Hall. The project also includes the installation of temporary steam as required to maintain steam service to the impacted buildings.