The work consists of specified demolition and legal disposal of the existing switchgear, emergency generator and associated equipment and installing a new 325 KVA emergency generator with segmental retaining wall and associated equipment, new switchgear and associated equipment and replace specified electrical panels to provide complete and operable normal and emergency power.