The scope of the project is to replace medium voltage, 250Kcmil, aluminum, concentric neutral, primary electrical cables of 1974+- vintage in the existing duct bank and manhole system. This cable will be replaced with new medium voltage, 500Kcmil, aluminum, concentric neutral, primary electrical cables.