Pre-bid meeting 02/09/2010 (attendance is strongly encouraged).
Work consists of but is not necessarily limited to replacing natural gas and water distribution system valves and boxes and adding new valves/boxes as required to properly isolate systems and to aid in systems maintenance campus wide. Maintain/repair existing natural gas system cathodic protection systems as required due to valve replacements/additions. Work includes demolition, pavement and sidewalk repairs, plumbing and electrical work as it relates to the valve replacements.