The RFP Database
New business relationships start here

Rehabilitate Flood Control Structures


Georgia, United States
Government : State
RFQ
Go to the link
This document has expired, therefore the above link may no longer work.

The State is seeking Statements of Qualifications from firms interested in providing professional design services (design services) related to the rehabilitation and or modification of managed watershed dams within the north east quadrant of the State.

The services to be provided shall consist of all operations described herein to survey as needed, perform geologic investigations, perform soil mechanics testing, design the solution identified in a previously completed Rehabilitation Analysis and Modification Alternatives Development Report (Hydrology Planning Report) for each site or an alternate solution developed by the designer that conforms to the same design requirements, and prepare the construction drawings and specifications; quantities; bid schedule; design report; cost estimate; inspection (QA – Quality Assurance) plan; erosion, sediment and pollution control plan; and other related documents for the rehabilitation modifications, as well as provide construction contract administration.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP