Remove and disposal of all Cattails growing on Banks of both City-owned Reclaimed Water Reservoirs, Lakes A and Lake B, with an approximate combined total acreage of 175 acres and roughly measured 3 linear miles of reservoir banks varying from 5' to approximately 20' wide. Successful bidder shall provide all necessary equipment / truck and personnel to excavate, load, and haul all debris excavated to the designated disposal site where it shall be deposited in piles 5.0' to 10.0' in height. See enclosed location / vicinity map with designated areas. Hauling distance is approximately seven (7) miles round trip.
2. Work shall include the restoration, grading, and re-sodding of all disturbed upland areas as identified by the owner at the conclusion of the project. All existing stabilized access roadways adversely disturbed or damaged by excavation activities shall be restored to equal or better condition by the bidder at their cost.
3. Project Duration not to exceed Ninety (90) days from notice to proceed.