This document has expired, therefore the above link may no longer work.
Work under this contract includes installation of four (4) new Aquifer Storage and Recovery (ASR) wells at the existing Recharge Facility Site (No’s 7-10) as well as two (2) new monitoring wells to meet regulatory requirements