The project consists of the installation of a 72-inch raw water pipeline as specified and shown on the Contract Drawings, installation of valve vaults and valves, electrical equipment, instrumentation and control equipment conduit and wiring, non-potable hydrants associated valves and piping, other miscellaneous equipment, and associated restoration and site work. Project also includes reconstruction of existing County and Township roads specified as haul routes, and an overlay of these haul routes at construction completion.