The project scope will include installing City provided submersible wastewater pumps in two existing pump station wet wells, installing underground vaults and valves, and construction of of ductile iron interconnecting piping. The scope will also include construction of approximately 990 lineal feet of 6-inch diameter HDPE force main by open cut trenching in City streets, and street restoration.