This project is for the Pump Station Remodel. Work includes, but is not limited to: 1. Installation of by-pass pumping facilities; 2. 14-inch force main modifications; 3. Removal of existing generator, diesel fuel tank and piping; 4. Demolition work; 5. Construction of concrete pad, CMU block control building and generator enclosure and site-obscuring chain link gate for new generator and subbase fuel tank.