Modify by converting from a single turbine pump to duplex submersible pumps, remove and replace with new concrete lid, relocate controls and electrical service from PS202 to lift station 3 site, replace electrical panel, modify S.C.A.D.A. components for duplex system operation, replace existing 24” RCP inlet pipe with 36” RCP and other items as shown on plans titled Modifications for Pump Station