Construction of approx. 110 linear ft of 18" diameter gravity treated effluent pipe; construction of a complete treated effluent pump station, including cast in place wet well and footings, wood frame bldg, pumps and appurtenances; construction of approx. 2,770 linear ft of 12" AWWA C900 treated effluent force main, including fittings, valves, outfall locations, headwalls, etc. Contract will include jack and bore installation of 24" diameter sleeve. Contract also will include reconstruction of the bituminous asphalt paved bike path after force main installation is complete.