Construction of a 2.0 MG pre-stressed, concrete ground storage tank; four high service pump assemblies and motors; electrical building and equipment; water line piping and control stations; surge tank; asphalt access road; concrete site access drives, security fencing; and other miscellaneous site improvements as required per the Contract Documents for a complete in-place facility, the Pump Station.