In general, the contractor shall supply all labor, materials, tools, and equipment necessary to install, complete and ready for operation, a new 100kw, 120/208V, 3PH, 60Hz, 4-wire diesel powered generator set, complete where shown on the attached plans along the southerly side of the Town Hall and as specified herein. The work shall include, but not be limited to, site work, associated electrical work and generator installation