The RFP Database
New business relationships start here

Project Manager for the Remediation of Hazardous Wildlife Areas at the Southwest Florida International Airport

  1. This RFQ had a pre-bid event.


Florida, United States
Government : County
RFQ
Download the rfq file: projMang_LeeCounty.zip.

It is envisioned that the work under this contract will involve the remediation of future areas (i.e., NE Conservation Area, Taxiway F drainage system, etc.) that will improve the safety of the RSW aircraft operating environment. Services to be provided under this contract include:

Engineering
Landscape Architecture
Surveying & Mapping
Planning and Permitting
Concept Refinement and Conceptual Design Analyses, Program Definition and Development
Project Reporting and Presentations
Design Development
o Site clearing, grading, and drainage plans and technical specifications
o Cost Estimating and Budgeting
o Soil Testing and Analyses
o Contamination Clean-up
o Geotechnical Testing and Analyses
o Bidding Assistance
Construction Administration
o Performing Project Inspections
o Responding to Requests for Information
o Reviewing Contractor Pay Applications
o Reviewing Contractor submittals, shop drawings, and samples for conformance with the Contract Documents
o Providing Engineering Project Certifications
Construction Services
o Providing Cost and Schedule Control
o Bidding Assistance
o Construction Management
o Overseeing of competitively selected Construction Contractors (selected and contracted separately to the Port Authority)
o Serving as the Port Authority's Field Representative
o Reviewing and recommending payments applicable to Contractor Pay Applications
o Providing Project Certifications
Management of various subconsultant engineering subcontracts and disciplines
Management of numerous project schedules and budgets
Management of design and engineering related projects
General engineering analyses
Civil, sanitary, structural, mechanical, electrical, surveying, building, geotechnical
and other related engineering disciplines
Preparation of detailed contract plans, specifications and construction bid documents
Preliminary and final cost estimate preparation
Project-related environmental permitting
Code compliance
Application assistance (including, but not limited to, grant and permitting
applications)
Local, state and federal permitting
Airline Coordination
FAA/FDOT Coordination
Feasibility studies, project development and conceptual analyses
Graphics and written/oral presentations
Miscellaneous research studies, data collection, and report generation
Preparation of legal descriptions, etc.
Testing services and investigative analyses
Value engineering, critical path analysis, general conditions preparation and interpretation
Claims evaluation
Providing DBE opportunities
GIS Services
All other duties related to the services outlined above and as deemed necessary by the Port Authority to successfully accomplish an airport development project