Community College has determined that it requires the services of a professional consulting engineering firm. The consultant will perform a feasibility study for the College Center (CC), Performing Arts Center (PA), Instructional Resource Center (IR) and Physical Education Center (PE) HVAC Upgrade project, prepare a report of the study results, provide construction cost and schedule estimates, prepare construction documents, and provide construction observation services.