The City of Boston Public Schools (the City), acting by and through its Director of Facilities Management/Senior Structural Engineer (the Awarding Authority), invites sealed bids for the above-entitled project, subject to all applicable provisions of law including, without limitation, sections 39F and 39K through 39P of chapter 30, and sections 29 and 44A to 44J, inclusive, of chapter 149 of the General Laws, as amended, and in accordance with the terms and provisions of the contract documents entitled: Preventive Maintenance of Automatic Temperature Controls and Energy Management Systems in Various Schools at an estimated cost of $2,100,000.00 for the period July, 1, 2009, through, June 30, 2012.