This contract includes a Bid Alternative for the construction of the Mine Run-on Control Ditch. Construction activities associated with the pit run-on control ditch include the following: Regrade access road; Run-on control ditch excavation; Run-on control ditch construction; Installation of 60-Mil flexible geomembrane lining, vegetative backfill material, and turf reinforcement mat; and Fertilize and Seed.