The purpose of this contract is to replace an existing interceptor sewer outfall. The design flow of the proposed replacement interceptor is 15.0 MGD. The flows vary from 1.2 MGD during a dry weather nighttime to 14.5 MGD during extremely heavy rainfall events. At the time of the publication of this specification the average daily dry weather flow was 3.0 MGD.