Purchase and installation of two (2) Network Cameras for Murray Morgan Bridge Construction
Site for a period of 18 months monitoring services.
Item Requested:Two (2) Network Cameras one for each side of the bridge
Type of camera:Minimum 4 Megapixel Remote Monitoring, Wireless camera
Other features required:Fixed or Pan/Tilt/Zoom type of cameraj Remotely controlledj
Multilevel user accountsj Weather and time of day documentation (and 48 hour
forecast)j Multifunction interactive calendarj Record and playback time lapsesj heavy
duty, tamper resistant camera and housing
Data connection:Wireless
Focus System:Auto focus, autowhite balance, autocontrast
Timeframe required: 18 months
Purchase or Lease:Purchase and Warranty