This project involves the rehabilitation of the low flow outlet works. Construction includes, but is not limited to the following: rehabilitating the sluice gates; replacement of the hydraulic gate operating system; modifying the existing SCADA system; placement of mass concrete; replacement of the trash racks; and new steel bulkheads.