Work to be done generally includes the demolition of existing lime system equipment and associated
plumbing, and related electrical equipment and controls; installation of a new RDP lime feed system
that includes slakers, tanks, pumps, piping, and associated mechanical/electrical/controls; structural
modifications to lime storage silos; lead paint removal; new coatings for walls and floors; concrete
repair; and other related work.
The rest of the documents can be found at: http://www.a2gov.org/government/financeadminservices/procurement/Pages/OpenBidsandProposals.aspx