The construction of the Lift Station, including below-grade wet well and valve vault,
approximately 71 feet of 12� gravity sanitary sewer pipeline and 1 manhole, above-grade motor
control center, control panel, electrical shelter, fencing, and entrance gates. The Work also
consists of pavement rehabilitation and electrical conduit extension and service modifications.