SCOPE OF WORK: This project includes the work necessary to properly abandon one
(1) existing drainage well and the construction of one (1) replacement drainage well, at
a new nearby location. Work includes drilling and construction of the replacement
drainage well, geophysical logging and flow testing upon completion, construction of
various storm drainage pipes, structures, and connection of existing storm drainage
systems. Other work includes activities related to mobilization, dewatering, erosion
control countermeasures and site restoration.
PROJECT LOCATION: The new drainage well project site is located at the north end of
Deede Lane, Orlando, FL 32806, in central Orange County.