The RFP Database
New business relationships start here

Kitchen Hallway Rubber Roof Replacemen


Massachusetts, United States
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Replace existing roof membranes & fiber glass insulation from the hallway.
Remove all existing stone, rubber membrane, asphalt membrane, insulation, and aluminum and lead flashing;
Inspect concrete roof for cracks and substantial damage/ make recommendations for repair;
Clean concrete to industry standard;
Replace existing roof drains, sealed water tight, complete with back drain prevention and basket strainers,
Seal water tight all penetrations, including duct work and cast iron stacks;
Install flashing for all ductwork and cast iron stacks;
Install no less than 2 of insulation to entire surface area of roof, secure with mechanical fasteners, providing pitch for adequate drainage;
Install new aluminum (brown) flashing to entire perimeter of building, including where cooper flashing currently exists;

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP