The RFP Database
New business relationships start here

Irrigation System Installation


Georgia, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Install irrigation. This system should have 1 inch main lines and 1 inch lateral lines. MP rotator head must be used on the entire system and 2 quick connect hose bids. The controller must have a weather station installed. There will need to be two (2) 40 foot bores. Power and backflow device will be provided.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP