Irrigation Improvement


Texas, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Furnish labor, materials, and equipment necessary for installation of irrigation improvements to include approximately 3,220' of 4" PIP underground irrigation pipe, pump stand with appurtenances, risers, valves, approximately 3,270' underground power cable, panel board, disconnects, etc. as specified.
Work shall include all fittings, devices, connections/tie-ins, excavation, backfilling, etc. in accordance with the attached specifications and drawings and as otherwise required for a complete and operational system, excluding floating pump station.