The project calls for the installation of a net metered photovoltaic electrical generation system for the Churchill County Swimming Pool. The electrical generation system will be mounted to a parking structure that will be designed and constructed within this project by the prime contractor.
The estimated cost for completing the project is $570,000. Costs incurred for installation and materials of the NV Energy electrical generation system must be reported and billed independently. This is for reporting purposes and does not separate the project into two individual projects.