It has been determined that the building, much of the equipment, duct work and wiring therein is in need of rehabilitation. This RFP is intended to implement a study of, but not limited to, the areas, structures and equipment, noted within this RFP, and a determination the equipment and procedures necessary to rehabilitate and upgrade the same to an operational status.