The contract includes but is not limited to, the following major items of work:
Demolition and Clearing Site
Soil Erosion and Sediment Control
Earthwork, including 43,600 CY of Site Grading and Common Earth Borrow
Site Work, including 452 Tons of HMA 19M64 Base Course; 1,128 Tons HMA
9.5M64 Surface Course; 2,180 LF Granite Block Curb;
Drainage Work, including 231 lf of 15 RCP
Water and Sanitary Sewer Lines, including 330 lf of 6 DIP; 466 lf 8PVC SDR-
35
Landscaping, including 19,885 SY topsoiling, 4 thick
Lighting, including 13 light poles