Intake Pump Piping and Electrical Replacement Base Bid: Work includes removal and replacement of piping, valves, appurtenances and the electrical system for the intake pump station. Add Alternate 1: Installation and calibration of telemetry system for the intake pump station Add Alternate 2: Removal and replacement of pedestrian bridge at the intake pump station Add Alternate 3: Installation of a pig launcher at the intake pump station and pig receiver at the microstrainer structure and pigging of an approximately five mile long existing 18” seawater pipeline.