The scope of this work consists of two phases. Phase 1 consists of drilling a water well to a maximum depth of 300 feet. Phase 2 is contingent upon Phase 1 successfully finding water in sufficient quantity and quality and includes demolition of concrete pavement, furnish and install precast vault, excavate/haul and dispose soil, furnish and install water holding tank, installation of piping and electrical work for pump, and heat trace pipe and heat blanket at water holding tank.