This project includes the following improvements: rehabilitation of approximately 3,700 lineal feet of 42-inch DIP pressure forcemain pipe. Cured-in-Place-Pipe (CIPP) will be utilized for the pipe rehabilitation; construction period of the 42-inch forcemain pipe can only be out of service between October 15th and March 15th.