Flood Protection


Texas, United States
Education : University
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Construct a perimeter floodwall around the Data Facility. The wall will be at least 1' above the 500 year flood plain. Flood gates, sump pumps and associated storm sewer tie-in are also included. The relocation of chilled water lines and installation of new CRAC unit is also required.