The work involves flood mitigation to prevent damage to the Mays Island Lift Station electric infrastructure in the event of future flooding similar to what the City experienced in 2008. The project includes, but is not necessarily limited to, raising electric panels or replacement of obsolete panels and placing them above projected flood levels in the above-ground structure located on top of the lift station.