The Work will consist of Installation of three-parallel, two inch diameter flex conduits in approximately 2,000 linear feet of trench (Approximately 6,000 feet of 2 inch conduit). Installation of approximately 550 cubic yards of gabion basket structures for erosion protection. Construction of 250 lineal feet of a sixteen (16) foot wide gravel roadway.