Projects that are assigned to the Engineer will include water pumping stations, sewage pumping stations, pump replacement, SCADA, water tank design, water tank painting, pressure reducing valves, facilities inspections and reports, electrical improvements, design for ancillary facilities such as emergency generators, and for water modeling (InfoWater) and sewer modeling (InfoSWMM). Projects will include those identified in the Capital Improvements Program as well as projects created by emergency conditions