The existing emergency spillway is a reinforced concrete structure at the north end. An upgrade to the existing woods road is required to access the construction site. Tree clearing and stump removal shall be accomplished on site with the burial of stumps on site as directed by the resident engineer. All erosion control measures, perimeter controls, a stockpile and staging area, approximately 150 feet by 150 feet, shall be in place with perimeter silt fencing prior to commencing any construction activities.