Replace existing underground elctric primary (12kV) and secondary circuits with new cables. The includes, but is not limited to, removing existing primary and secondary cables out of conduit, installing new cable and equipment to replace the old, and making up cable terminations reday for electrical equipment. The required services are described in the IFB.