The City is requesting bids for the removal and disposal of approximately 150 feet of 36 inch diameter reinforced concrete pipe and the existing concrete outfall structure. Installation of approximately 150 feet of 42” HDPE DR-17 IPS fused pipe, a new outfall structure and junction box/manhole. Provide bypass pumping and dewatering as necessary.