The work consists of furnishing all labor, material, and equipment required for construction of approximately 3.5 miles of 8-inch through 48-inch sewers, 2.0miles of 8-inch through 20-inch ductile iron water main, approximately 2.5 miles of paving, including restoration and all associated work as shown on the drawings or specified in the project manual.